Sự kiện

Vụ Estlink 2 năm 2024

failure of Estlink 2 cable

Wikipedia

On 25 December 2024 at 12:26 EET, the Estlink 2 submarine power cable had an unplanned failure, reducing the Estonia–Finland cross-border capacity from 1,016 to 358 MW. Concerns about potential sabotage immediately arose due to other recent outages in the Baltic Sea region.

On the evening of the same day authorities were informed of disruptions to four telecommunications cables. Two cables belonging to the Finnish telecommunications company Elisa had been completely severed until Elisa finished their repairs on 6 January 2025. Repairs to the power cable itself are expected to take months and cost tens of millions of euros.

Finnish authorities are investigating the incident and suspect that the oil tanker Eagle S, believed to be part of the Russian shadow fleet, had intentionally caused the cable ruptures by dragging its anchor. The ship is being suspected of aggravated vandalism, an aggravated regulatory offense and aggravated communication interference.

Đang tải bài viết từ Wikipedia…

Nội dung từ bài Wikipedia “Vụ Estlink 2 năm 2024”, theo giấy phép CC BY-SA 4.0.

Cùng lúc, ở nơi khác

Gửi góp ý

Một ý tưởng, một chỗ sai về lịch sử, một thứ không chạy: mọi góp ý đều được đọc.

Góp ý về

Gửi kèm những gì có trên màn hình này (ở trên), địa chỉ trang và giao diện màu. Trình duyệt, thiết bị, ngôn ngữ và vị trí gần đúng của bạn được đọc từ chính yêu cầu, như mọi trang web đều nhận được. Cách chúng tôi lưu giữ: quyền riêng tư.