AT&T Stadium is a retractable roof stadium in Arlington, Texas, United States. It serves as the home of the Dallas Cowboys of the National Football League (NFL) and opened in 2009. It is also the home of the Cotton Bowl Classic and the Big 12 Championship Game, and hosted the Southwest Classic until 2024. The stadium was one of 11 US venues that hosted matches during the 2026 FIFA World Cup. The facility, owned by the City of Arlington, has also been used for a variety of other activities, such as concerts, basketball games, soccer, college and high-school football contests, rodeos, motocross, Spartan Races and professional wrestling. It replaced the partially covered Texas Stadium, which served as the Cowboys' home from 1971 through the 2008 season.
The stadium is widely referred to as Jerry World after Dallas Cowboys owner Jerry Jones, who originally envisioned it as a large entertainment venue. The stadium seats 80,000 people, but can be reconfigured to hold over 100,000 people by the use of standing room, making it the largest stadium in the NFL by seating capacity. Additional attendance is made possible by the Party Pass (open areas) sections behind the seats in each end zone that are positioned on a series of six elevated platforms connected by stairways. The record attendance for an NFL regular season game was set in 2009 with a crowd of 105,121. It also has twin video boards that are among the top 100 largest high-definition video screens in the world.
Construction and design
Originally estimated at $650 million, the stadium's actual construction cost rose to $1.15 billion, making it one of the most expensive sports venues ever built. To aid Cowboys owner and general manager, Jerry Jones, in paying the construction costs of the new stadium, Arlington voters approved the increase of the city's sales tax by 0.5%, the hotel occupancy tax by 2%, and car rental tax by 5%. The City of Arlington provided over $325 million (including interest) in bonds as funding, and Jones covered any cost overruns. The NFL provided the Cowboys with an additional $150 million loan, following its policy for facilitating financing for the construction of new stadiums.
The lead architect on the design team at HKS Architects for the project was Bryan Trubey, who has stated that the overarching concept for the stadium was "...that this should not be just a stadium, but should almost be built like a civic structure."
A pair of nearly 300 ft (91 m)-tall arches spans the length of the stadium dome (one of the tallest domes in the world), anchored to the ground at each end. The new stadium also includes "more than 3,000 Sony LCD screens throughout the luxury suites, concourses, concession areas and more, offering fans viewing options that extend beyond the action on the field". It also houses a center-hung Mitsubishi video display board that was the largest HDTV screen in the world at the time of its installation. It has since been surpassed in size by the Panasonic "Big Hoss" video board (218 feet (66 m) wide and 94.6 feet (28.8 m) tall) at Texas Motor Speedway. Glass doors, allowing each end zone to be opened, were designed and constructed by Dallas-based Haley-Greer glass systems.
The retractable roof was designed by structural engineering firm Walter P Moore and the systems were implemented by mechanization consultants Uni-Systems. The electrification of Cowboys Stadium's retractable roof was developed by VAHLE, Inc. These kinetic architecture fundamentals are employed to create quick conversions of the facility to accommodate a variety of events. When the design was officially unveiled on December 12, 2006, it showed that from inside the stadium, the roof (membrane installed by K Post Company of Dallas) would look very similar to the Texas Stadium roof, with its trademark hole. However, it can be covered by the retractable roof panel to protect against the elements.
The football turf field was built by Hellas Construction, which developed a special SoftTop Convertible Turf system that has 26 interchangeable panels to allow the stadium to host a variety of events from concerts, dirt bike races, and monster truck rallies to college football, basketball, and soccer games.
Renovations and improvements
AT&T Stadium has seen several renovations and improvements since it opened in 2009. In August 2023, the Dallas Cowboys announced a series of renovations and improvements for technology and interior spaces within the stadium. The planned improvements included changes to the center-hung video board, retail, concessions, luxury suites, interior areas, and other spaces inside the stadium. The total improvement project was estimated at $295 million, and about $180 million of that was for interior improvements within the stadium.
The improvements were expected to include a center-hung video board with 4K capability. The improvements also included planned renovations to seven AT&T Stadium Pro Shops. New permanent concessions and bars were also planned. Additionally, wellness areas were planned for the main clubs and upper concourse. The project also included planned changes to interior design, technology, and luxury suites. Corridors connecting the luxury suites were also scheduled for renovation. According to reports from August 2023, the renovations were planned to occur over multiple phases of the project while minimizing disruptions to events and games.
In August 2023, a project for interior renovations at AT&T Stadium was registered with the Texas Department of Licensing and Regulation as project TABS2023026459. The project, titled "AT&T Stadium Interior Refresh," had an estimated project budget of $180 million and covered approximately 575,000 square feet. The project included planned improvements to luxury suites and premium clubs, including finishes and millwork. The registered design architect for the project was HKS Inc., the architectural firm that designed the original AT&T Stadium. The project listed a proposed start date of January 2, 2024, and a proposed completion date of July 31, 2025. The project was also listed in the Texas Department of Licensing and Regulation database as having an inspection status of "Inspection Complete."
The project improvements were scheduled ahead of the 2026 FIFA World Cup. AT&T Stadium served as one of the tournament's venues. According to 2023 reporting, the improvements were planned to continue into 2025 with the goal of completion prior to the World Cup. The interior renovations and improvements were expected to include upgrades to interior, premium seating, technology, and service areas within the stadium, with a goal of little or no changes to the exterior appearance of the stadium.
In April 2026, the Arlington City Council approved an extension of the Dallas Cowboys' lease at AT&T Stadium through 2055. The previous lease on AT&T Stadium was set to expire in 2040, and this lease extension added 15 years. As part of the agreement, the Cowboys agreed to invest a minimum of $750 million in maintenance, improvements, and operations of the stadium through the new lease. The City of Arlington also agreed to provide a maximum of $273 million over a 20-year period through a maintenance and operations fund. Funds for the City of Arlington would be drawn from existing voter-approved venue taxes and would not be drawn from the city's general fund or from new taxes.
The agreement also included planned improvements to the stadium and other public elements within the stadium complex. Improvements included plans for changes to event operations, security, traffic flow, pedestrian access, and safety. The Dallas Cowboys would continue to operate and maintain the stadium as well as be responsible for the design and construction of improvements. The Cowboys would fund eligible improvements and receive reimbursement from the city over time. The improvements were scheduled to be completed by 2043, and the Cowboys' lease would remain in effect through 2055 under this agreement.
Timeline
- 1994: Cowboys owner Jerry Jones proposed to expand the 65,000-seat Texas Stadium by up to 40,000 seats, add retractable roof panels and install a climate-control system to make the stadium a year-round venue for sporting events, including the Super Bowl, concerts, and conventions.
- 1997–2000: The Cowboys held preliminary talks with Arlington officials about building a stadium there. The team also publicly discussed a $260 million plan to upgrade Texas Stadium. In 2000, the Cowboys compiled a list of potential stadium sites, which included Grapevine, Coppell, and Arlington. The team continued negotiating with Irving to renovate Texas Stadium.
- 2001: Jones said Arlington is a leading contender for a $500 million stadium. The primary site considered is the 2,000 acres (810 ha) Lakes of Arlington tract on Farm to Market Road 157. Other cities in the running included Grapevine and Grand Prairie. In October, Jones discussed the new stadium with the mayors of Arlington, Irving, Grapevine, and Dallas.
- 2003: The Cowboys asked the Irving City Council to extend their lease at Texas Stadium, which was to expire at the end of the 2008 season, on a year-to-year basis. They narrowed their search to sites in Las Colinas and Dallas, and state legislators filed bills that would allow Dallas County to increase its hotel-occupancy and car-rental taxes to pay for a new stadium.
- 2004: In April, the Cowboys announced plans to build a $650 million stadium at Fair Park in Dallas. The deal required $425 million in public financing from a 3% hotel-occupancy tax and a 6% car-rental tax. The deal fell apart in June when Dallas County commissioners said they cannot justify asking voters to approve the team's request for $425 million in public funding. In July, the Cowboys and Arlington announced they are negotiating to locate the stadium near Globe Life Park (then Ameriquest Field). In August, the Arlington City Council agreed unanimously to put before voters a tax increase that would fund the city's $325 million portion of the project. Voters approved the tax increase on November 2.
- 2005: Arlington and the Cowboys chose the site south of Randol Mill Road and east of Collins Street for the new stadium. The city began notifying residents and property owners of its plans to acquire their property. The Cowboys hired the HKS architectural firm to design the stadium. Early blueprints showed 414 luxury suites and a two-panel retractable roof. The city completed its sale of $297.9 million in bonds to pay for its portion of the construction. Demolition of houses began November 1. This included homes that the city had seized from residents who wanted to keep their house and refused to sell. One such resident characterized the negotiation for his home as "...giving me pennies and telling me to get out"
- January 2006: The Cowboys hired Oklahoma-based Manhattan Construction as the general contractor for the stadium and the city completed its land purchases, although it still faced a number of lawsuits over land acquisition. Later that month, Tarrant County work crews began demolition of more than 150 Arlington residences and small-business structures to make room for the stadium.
- March 2006: An alliance was announced between Manhattan Construction and two general contractors, Rayco Construction of Grand Prairie and 3i Construction of Dallas, to manage the stadium's construction.
- April 2006: Excavation began by Mario Sinacola and Sons Excavating. By August, they had moved over 1.4 million cubic yards (1,100,000 m3) of earth, shaping a 13-to-14-acre (5.3 to 5.7 ha) stadium bowl an average of 54 feet (16 m) deep.
- August 2006: Two construction cranes were raised on the site.
- October 2006: The grass amphitheater on Randol Mill Road was leveled to make way for the extension of Baird Farm Road.
- December 2006: The stadium's structure began to go up, and on December 12, Jerry Jones unveiled the in-depth plans and designs of the stadium to the public.
- January 2007: A construction worker was injured in a 20 ft (6 m) fall.
- February 2007: Masonry work began.
- March 2007: Heldenfels Enterprises was awarded the contract to manufacture and erect the precast/prestressed concrete structural components and placement of them began in April.
- June 2007: Work on the retractable roof, designed by Uni-Systems, started.
- July 2007: Exterior facade and enclosure work began.
- October 2007: The first steel arch was completed.